Baxters stepover .jpg

Fibreglass Bunded wall access.

This Access was required due to the original access not being accessible as the site is expanding , installing more plant.  

505 - 506 Access Bund

Access platform designed and installed for weekly sensor testing, 

baxters wbb_edited.jpg
steps with treads.jpeg

Stair Tread Nosing.

Stair Tread Nosing installed in yellow with deep course Anti-slip surface for extra grip. Transform your existing stairs and prevent potential Slips. 

505 Battery Access 

This is a on going project for one of our clients. Access to new battery heaters that have been installed, They require permanent access for daily maintenance checks. 

505 design.png